Most switchgear failures give some warning first: a hot connection, a slow breaker, a relay that has drifted out of calibration. A maintenance plan is how you catch those while they are still cheap to fix.
We build the plan around your facility: what is installed, how critical it is, and how long it has been since it was last tested. Then we inspect, test and service on a schedule, covering both high and low voltage systems, so you are not finding out about problems the hard way.
Typical reasons people call
- Nobody can say when the switchgear was last tested.
- An insurer, inspector or customer is asking for maintenance records.
- You want planned outages instead of surprise ones.